Scope of work:
Two pedestrian and bicycle ramps integrated into a promenade were built on the bridge.
The bridge is approx. 110 m long with a peak height of 17.58 m and width of 11 m.
Complexity of the project:
Work above the most heavily traveled high-speed roadway in the State of Israel (Netivei Ayalon), requiring lane closings and construction staging for short periods of time in order to complete tasks while taking field conditions into consideration.
Description of services:
• General budget management
• Construction management and supervision through handover
• Timetable management
• Progress payment and final payment control